866-321-5358
OTHER C-TECH ENTITIES

C-Tech Transportation Services, LLC

As a compliment to the other C-Tech companies, C-Tech Transportation Services, LLC (CTTS) provides bonded transportation brokerage services for your freight hauling needs.  CTTS specializes in hot-shot and expedited delivery services throughout the continental U.S.  We can accommodate oversized and super loads and are insured for up to $1,000,000 in cargo. For your convenience and tracking needs we offer 24 hour dispatch and all trucks are fitted with GPS tracking capabilities.

Through its sister company, Blackburn Construction, Inc., CTTS has available the following fleet of hauling equipment: tractor trucks with trailers (flat and step-deck); flatbed gooseneck trailers (20’, 26’, and 40’), and 1/2 ton, 3/4 ton, and 2 ton trucks.

BC Properties, LLC

BC Properties, LLC is a property holding and management company for the C-Tech group of companies.  BC Properties manages and maintains over 25 residential and commercial rental properties in the El Dorado, Kansas area.

Sixth Street Equipment, Inc.

All field construction equipment and tools owned by the C-Tech companies are managed and maintained by Sixth Street Equipment, Inc.  Three full time mechanics are on staff to ensure all equipment, field trucks, and tools are maintained and operating in safe proper working condition.

El Dorado Workforce, Inc.

El Dorado Workforce, inc. (EWI) supplies the El Dorado area with temporary workforce solutions.  From manufacturing to clerical services, EWI can provide your company with qualified personnel to meet your temporary staffing needs. Several of our temporary placement have gone on to full-time hire status with our customers.

TESTIMONIAL

“I wish to take this moment once again to share the appreciation from both myself, as Project Manager, and the NuStar Energy Central East for your contributions to our El Dorado Potwin Expansion project. It was through the combined dedicated and professional efforts of all individuals that made this project the success that it has been. It was truly a team effort from those within the NuStar organization as well as those contract and support individuals that have accomplished this project in the manner it was completed.

The overall project consisted of the construction of approximately 12.5 miles of new 10-inch diameter pipeline between El Dorado and Potwin, Kansas; the construction of new pipeline pump station facilities with VFD at our El Dorado, Ks pump station. We completed the project within the $16.1 million budget, and with no lost time injuries. It was a pleasure to work with each of you and we look forward to working on future projects with you in the future.”

- Dale E. Smith
NuStar
Project Superintendent

Join our mailing list to learn more about and
stay current with C-Tech Industrial Group.